Well, getting everything done did not happen. But what did get done I am very happy about.
Things we got done.
- Two new tires for the front.
- Oils changed (engine and tranny)
- Got CB working
- Replaced the trailer break controller
- Replaced the ABS sensor
- Put in an power cord so it can feed the power at the couch
Thanks to D.M. for getting several of these things done!
I did make a decision not bring the bikes, so removed the bike rack.
So we are not leaving today, we will leave in the morning.
Thursday, June 20, 2019
2019/06/20 - Thursday - Getting ready to go
Labels:
2019 Vacation,
Bike Rack,
Fixing,
Helping Out,
Oil Change,
Prepare,
RV,
Tire
Location:
Lakewood, CA, USA
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment